Burn Chamber

Back



Burn Chamber Case (151kb) End of Burn Chamber (209kb) Pressure Transducer closure (232kb) Igniter leads (252kb) PT connection (267kb)
PT attached (92kb) Complete PT setup (86kb) 3 wire closure (83kb) Test Propellant installed (67kb) Igniter installation in the end of test propellant (126kb)
Wire connections to the burn chamber (115kb) Updated 4 wire closure (142kb) Epoxy insulation for break wire connections (301kb) Tape used to center and hold connectors for epoxy (296kb)