Static Test Reports 2004

Back to SRT 04

Click on picture to see larger image.

1/24/04 Test area (57kb) 1/24/04 More people showing up (46kb) 1/24/04 Steve setup for his 3 inch test (63kb) 1/24/04 Hooking up the data collection (64kb) 1/24/04 The parking area looking from the launch area (33kb)
1/24/04 3 inch grains and nozzle ready to go into the case (176kb) 1/24/04 Steve's 3 inch motor (198kb) 1/24/04 Ed w and friends setting up a sugar motor test (115kb) 1/24/04 Steve setting up for his 3 inch motor test (148kb) 1/24/04 Steve's motor cato'ed and here is whats left of the test stand (126kb)
1/24/04 The case after the cato (181kb) 1/24/04 The stand after the cato (174kb) 1/24/04 Steve's motor parts that we could find (219kb) 5/16/04 Kens thrust stand (130kb) 5/16/04 Setup of the thrust stand (203kb)
5/16/04 Kens 54mm AN motor ready for testing (260kb) 5/16/04 Ken's 3 inch AN L motor (303kb) 5/16/04 The motor loaded in the thrust stand (131kb) 5/16/04 Setting up in the bunker (183kb) 5/16/04 Ken hooking up the load cell (163kb)
5/16/04 The data collection box (127kb) 5/16/04 The motor ready to go (116kb) 5/16/04 BunkerCam installed (128kb) 5/16/04 The setup (204kb) 5/16/04 Dta collection cables and power to the camera (141kb)
5/16/04 Ken's first AP motor cato with nozzle and washer strikes (280kb) 5/16/04 Another shot of the damage (276kb) 5/16/04 Ken's AN motor burn (347kb) 12/16/04 Ed W setting up the hybrid connections (163kb) 12/16/04 The data collection sensors (131kb)
12/16/04 A better view of data collections (159kb) 12/16/04 The thrust stand (201kb) 12/16/04 The first hybrid motor (22kb) 12/16/04 the second hybrid motor (18kb)